太火鸟 设计交易 设计案例 设计公司 社区 项目管理 增值服务 THN-X 关于太火鸟 联系我们

Elementary school, Junior high school, Nursery [Toni Elementary School/ Toni Junior High School/ Toni School Nursery]


1/3

In the Great East Japan Earthquake, the elementary school and nursery school of this area were swept away by the tsunami, and the junior high school received structural damage due to the earthquake shake. In this plan, it was desired that the schools should be put into the premises of the junior high school, which avoided damage of the tsunami, and planned to be able to operate in the elementary and junior high school in the future. Since the flatland in the premises has already been used for temporary school buildings, unused steep slopes were the main construction areas. In addition to preparing views from various azimuths and heights, we made variations in the space themselves and made consideration so that we can spend nine years without being bored.

发布 2020-11-25 来源 https://www.g-mark.org
最新评论

设计公司

Kamaishi-City

设计师

Inui Architects + TOKEN C. E. E Consultants

设计奖项

颜色

对该产品有疑问?点击反馈

相关推荐

  • 意见反馈

    公众号
    看案例
    电话